The Personnel of SVK was under
the supervision of Kdr. Kpt.z.See Bramesfeld, and were divided into two
departments (1) Naval and (2) Technical. The Naval Department was assigned
approximately 500 Naval personnel who were allocated, as needed, among the
Department's four sections; (1) Mines, (2) Influence Sweeps, (3) Depth
Charges, etc., (4) Sweeps, and a flotilla consisting of about 200 vessels
ranging in size and pur-pose from steamships to motor boats. The Technical
Department consisted of about 450 personnel, about 60 of whom were in the
scientific and design division, which was divided as follows: (1) Mines,
general mechanical, (2) Sweeps, (3) Influence device and physical fields,
(4) Depth charges and aircraft mine cases. |
The drafting rooms and shops were
allocated 50 and 300 personnel respectively, the remaining personnel being
admisistrative and clerical. Some Technical personnel held spe-cial Naval
rank, while others remained in a civilian status. In practice, the
scientific, technical, and design work was handled by the Technical
Department and the Marine ex-perience added by the Naval Department. |